Sign In | Join Free | My fnxradio.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
Verified Supplier

11 Years

Home > Seamless Steel Tube >

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

Brand Name : Torich

Model Number : ASME SA210

Certification : ISO

Place of Origin : CHINA

MOQ : 5 tons

Price : USD 700 - 1100 per Ton

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 5000 Tons per Year

Delivery Time : 30 - 45 days

Packaging Details : In Bundle or Wooden Box.

Product name : Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

Technique : Cold Drawn

Section shape : Round

Length : As Per Client Requested

Surface treatment : Oiled

Alloy or not : Non-alloy

Secondary or not : Non-secondary

Contact Now

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

Product Deacription

Application For boiler tubes, boiler flues and superheater tubes
O.D. 12.7 - 127 mm
Min W.T. 0.9 - 12.7 mm (Tolerance: +20%)
Length As per client requested

Chemical Composition

Grade
C
Mn
P
S
Si
A-1
≤0.27
≤0.93
≤0.035
≤0.035
≥0.10
C
≤0.35
0.29-1.06
≤0.035
≤0.035
≥0.10

Mechanical properties

Grade
Yield Point
Mpa(ksi)
Tensile Strength
Mpa(ksi)
Elongation
A-1
≥255(37)
≥415(60)
≥30%
C
≥275(40)
≥485(70)

≥30%

Product Picture

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater

FAQ

Q: Are you trading company or manufacturer?

A: We are a professional steel pipes materials manufacturer.

Q: How long is your delivery time?

A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.

Q: Do you provide free sampleas?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater


Product Tags:

ASME SA210 Seamless Steel Tubes

      

Boiler Seamless Steel Tubes

      

Superheater Seamless Steel Tubes

      
Wholesale Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater from china suppliers

Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)