Sign In | Join Free | My fnxradio.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
Verified Supplier

11 Years

Home > Precision Steel Tube >

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

Brand Name : Torich

Model Number : JIS 3455

Certification : ISO

Place of Origin : Zhejiang, China

MOQ : 5 tons

Price : Negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 600 Ton/Tons per Month

Delivery Time : 30-45 days

Packaging Details : Fluid Pipes packed in wooden boxes or hexagonal bundles in seaworthy packing.

Product name : JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

Keywords : Fluid Pipes

Standard : JIS 3455

Technical : Hot Finished or Cold Finshed

name : Precision Seamless Steel Tube

certification : ISO

Contact Now

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

Product name: JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes
Keywords: Fluid Pipes
Standard: JIS 3455
Material: STS38, STS42, STS49, STS370, STS410, STS480
OD: 10.5-660.4 mm
WT: 1.7-64.2 mm
Technical: Cold Drawn, Hot Rolled
Application: Liquid/Gas Transportation gas pipe

Method of manufacture

a) The pipe shall be manufactured from killed steel by the seamless process and shall be finished according to table3.

b) The pipe shall be subjected to the heat treatment specified in table 2. The heat treatment other than those specified

in table 2 shall be agreed upon by the purchaser and the manufacturer.

e)When required by the purchaser, the pipe may be furnished with a bevel end.

Table 1 Chemical compositions:

Designation of grade C Si Mn P S
STS 370 0.25max. 0.10 to 0.35 0.30 to 1.10 0.35max. 0.35max.
STS 410 0.30max. 0.10 to 0.35 0.30 to 1.40 0.35max. 0.35max.
STS 480 0.33max. 0.10 to 0.35 0.30 to 1.50 0.35max. 0.35max.

Table 2 Heat treatment:

Designation of grade Hot-finished seamless steel pipe Cold-finished seamless steel pipe
STS 370
STS 410
As manufactured. However, low temperature annealing or normalizing may be applied, as necessary. Low temperature annealed or normalized
STS 480 Low temperature annealed or normalized

Table 3 Designations of grade and manufacturing process:

Designation of grade Designation of manufacturing process
Manufacturing process of tubes Method of finishing Marking
STS 370 Seamless:S Hot finished: H
Cold finished: C
Marking of manufacturing method shall be as standard.
STS 410
STS 480

Product Display of JIS 3455 Pecision Seamless Steel Tubes Fluid Pipes

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid PipesJIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid PipesJIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

Company Introduction

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid PipesJIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

3455 Seamless Non-Alloy Steel Tubes Fluid Pipes











Product Tags:

precision steel pipe

      

precision seamless pipe

      
Wholesale JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes from china suppliers

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)