Sign In | Join Free | My fnxradio.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
Verified Supplier

11 Years

Home > Seamless Steel Tube >

Hot Finished Seamless Steel Tube EN10210-1 For General Engineering Purpose

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Hot Finished Seamless Steel Tube EN10210-1 For General Engineering Purpose

Brand Name : TORICH

Model Number : EN10210-1

Certification : ISO9001, ISO14001, TS16949

Place of Origin : ZHEJIANG, CHINA

MOQ : 5Tons

Price : negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 2000Tons per Year

Delivery Time : 30-45 work days

Packaging Details : Heavy Wall Steel Tubs are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Keyword : Heavy Wall Steel Tubing

Standard : EN10210-1

Material : Carbon Steel

Surface : Pickled

Shape : Round

Alloy Or Not : Non-Alloy

Length : max 12000mm

OD : 6-168mm

WT : 1-30mm

Usage : For General Engineering Purposes

Contact Now

Products Description
TORICH EN10210-1 Hot Finished Heavy Wall Steel Tubing for General Engineering Purpose
Standard
EN10210-1
Hot finished structural hollow sections of non-alloy and fine grain steels
Part 1: Technical delivery conditions
Part 2: Tolerances, dimensions and sectional properties
Cold forming
Process is done at ambient temperature
Application
For Construction & Decoration, For General Engineering Purposes
Manufacture
Structural hollow sections are manufactured by seamless or by welding.
Welded sections manufactured by contiuous process.
Electric welded hollow sections are supplied without trimming the internal weld bead.
Delivery condition:
Qualities JR, J0, J2 and K2 - Hot finished
Qualities N and NL - normalized. (normalized rolled)
- for accelerated cooling +DC
- for quenching and tempering +QT
Surface conditon
The hollow sections have a smooth surface corresponding to the manufacturing method used; bumps, cavities or shallow longitudinal grooves resulting from the manufacturing process are permissible, provided the thickness is within tolerance.

Permissible deviations of the product analysis from the specified limits of the cast analysis specified
Element
Permissible maximum content in the cast analysis
Permissible deviation of the product analysis from specified limits for cast analysis % by mass
C
≤0.20
+0.02
>0.20
+0.03
Si
≤0.60
+0.05
Mn
Non-alloy ≤1.60
+0.10
Fine grain ≤1.70
-0.05
+0.10
P
Non-alloy ≤0.040
+0.010
Fine grain ≤0.035
+0.005
S
Non-alloy ≤0.040
+0.010
Fine grain ≤0.030
+0.005
Nb
≤0.060
+0.010
V
≤0.20
+0.02
Ti
≤0.03
+0.01
Cr
≤0.30
+0.05
Ni
≤0.80
+0.05
Mo
≤0.10
+0.03
Cu
≤0.35
+0.04
0.35<Cu≤0.70
+0.07
N
≤0.025
+0.002
Altotal
≥0.020
-0.005

Product Show

Hot Finished Seamless Steel Tube EN10210-1 For General Engineering PurposeHot Finished Seamless Steel Tube EN10210-1 For General Engineering Purpose

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH EN10210-1 Hot Finished Heavy Wall Steel Tubing for General Engineering Purpose












Product Tags:

seamless steel pipe

      

precision stainless steel tubing

      
Wholesale Hot Finished Seamless Steel Tube EN10210-1 For General Engineering Purpose from china suppliers

Hot Finished Seamless Steel Tube EN10210-1 For General Engineering Purpose Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)